
FB-ECITY-002 E-City Bike
OEM/ODM electric city bike for urban mobility programs. MOQ starts from 50 pcs; production lead time is 45–55 working days.

OEM/ODM electric city bike for urban mobility programs. MOQ starts from 50 pcs; production lead time is 45–55 working days.

OEM/ODM 700C electric cargo bike for delivery and utility fleets. MOQ starts from 50 pcs; production lead time is 45–55 working days.

OEM electric touring bike for urban mobility and trekking programs. MOQ starts from 50 pcs; production lead time is 45–55 working days.






Secure and durable battery rack systems designed for rear-rack e-bike integration and mass production.


Lightweight aluminum gravel frame engineered for OEM projects. Factory-based production, flexible MOQ, export-ready for EU & US markets.


Custom 6061 aluminum 700C step-through e-bike frames for Bafang center motors, with customizable motor brackets, down-tube battery and OEM support.

Specification | Details |
|---|---|
Frame Type | Step-Through E-Bike |
Material | Aluminum 6061 |
Wheel Size | 700C |
Motor | Center Motor |
Motor Fitment | Bafang Motor |
Motor Bracket | Customizable |
Battery | Down-Tube Battery |
Brake | Disc Brake |
Rear Hub | Quick-Release Hub |
Cable Routing | Internal |
Frame Size | Customizable |
MOQ | 50 pcs |
Sample Lead Time | 45–55 working days |
Production Lead Time | 45–55 working days |
Continue browsing

Custom 6061 aluminum 27.5-inch Trekking e-bike frames with customizable Bafang or Ananda center-motor brackets, down-tube battery and thru-axle.

Custom 6061 aluminum 20-inch E-Cargo Bike frames with hub-motor and down-tube battery integration, up to 150 kg system load and custom sizing.

Custom 6061 aluminum 24-inch folding e-bike frames with rear hub motor and integrated down-tube battery for OEM and private-label brands.

Custom 6061 aluminum full-suspension e-bike frames for OEM brands, with center-motor and down-tube battery integration, internal cable routing and custom sizing.

Custom 6061 aluminum Gravel e-bike frames for OEM brands, with hub-motor and down-tube battery integration, internal cable routing and custom sizing.
New drops and care notes
Monthly product releases, care reminders, and practical buying guides. No loud campaigns.
Have a design
BUYER DECISION CARD
Key commercial details to review before requesting a quotation.
MOQ starts from 50 pcs. Sample lead time is confirmed case by case after specification review. Production lead time is typically 45–55 working days.
Available trade terms: EXW · FCA · FOB · CFR · CIF.
Testing plans are defined by product type, target market and agreed specifications. Reports are available when included in the project scope.