



OEM step-through e-bike frame for wholesale
Comfortable Design. Reliable Performance. Built for Urban Mobility.




ebike battery rack--OEM Manufacturing for Electric Bicycle Brands
Secure and durable battery rack systems designed for rear-rack e-bike integration and mass production.



custom mid-drive e-bike frame development
EU compliant electric bike frame Custom Shimano/ Bafang / Bosch Mid-drive motor trekking frame

FBF001 AlUMINUM ROAD BIKE FRAME
Lightweight aluminum gravel frame engineered for OEM projects. Factory-based production, flexible MOQ, export-ready for EU & US markets.


FB-ECITY-002 E-City Bike
OEM/ODM electric city bike for urban mobility programs. MOQ starts from 50 pcs; production lead time is 45–55 working days.

E-system
- Battery: 500Wh
- Charger: 2A 220-240V
- Display: LCD
- Motor: Bafang Hub motor 36W250W
Frame
- Frame: Aluminium 6061
- Modular Rail System: No
- Maximum loadable weight: 130 kg
Drive
- Cassette: Gates Carbon Drive CDC Sprocket, 9 Spline
- Chain: Gates Belt Carbon Drive Belt CDC, 122T
- Crankset: Crankset 170 mm
- Gear: NO
- Shifter Right: NO
Fork
- Front Fork: Aluminum6061 compact
Components
- Front Brake: Tektro Hydraulic Disc brake, resin pad, 160 mm
- Rear Brake: Tektro Hydraulic Disc brake
- Headlight: Option
- Rear Light: Option
- Brake light: No
- Grips: Ergo Rubber Grips
- Handlebar: Dia. 31.8 mm, Rise: 25 mm, L: 640 mm
- Pedal: Wellgo Anti Slip with Reflector
- Saddle: DDK black
- Seatpost: Non-Suspension , L: 300 mm
- Wheelset
- Rim: Aluminum6061, 36H, black
- Tyre: KENDA
Continue browsing
More Frame Models from the catalog

FB-ECITY-004 E-Touring Bike
OEM electric touring bike for urban mobility and trekking programs. MOQ starts from 50 pcs; production lead time is 45–55 working days.
New drops and care notes
Get the next edit before it sells through.
Monthly product releases, care reminders, and practical buying guides. No loud campaigns.
Have a design
OEM SUPPORT
BUYER DECISION CARD
Plan Your OEM Project with Confidence
Key commercial details to review before requesting a quotation.
MOQ & Lead Time
MOQ starts from 50 pcs. Sample lead time is confirmed case by case after specification review. Production lead time is typically 45–55 working days.
Trade Terms
Available trade terms: EXW · FCA · FOB · CFR · CIF.
Testing & Quotation
Testing plans are defined by product type, target market and agreed specifications. Reports are available when included in the project scope.
