All products
32 products
Page 3 of 3
DSC_0045 拷贝
E CITY

FB-ECITY-004 E-Touring Bike

OEM electric touring bike for urban mobility and trekking programs. MOQ starts from 50 pcs; production lead time is 45–55 working days.

Product Name E-Tour-G
Custom Hub Motor E-bike Frame Designed for urban, and daily-use commuter e-bike brands.

KEY SPECS

Material
Wheel
Motor
Battery
MOQ
Application
AL6061
27.5”
Hub-motor
Downtube
50 pcs
Urban / Trekking

E-system

  • Battery: 500Wh
  • Charger: 2A 220-240V
  • Display: LCD
  • Motor: MXUS 36V250W

Frame

  • Frame: Aluminum 6061
  • Modular Rail System: No
  • Maximum loadable weight: 130 kg

Drive

  • Cassette: Shimano 7spd Freewheel
  • Chain: KMC Z7
  • Crankset: Crankset 42T W/plastic cover; 170 mm crank
  • Gear: Shimano TY300
  • Shifter Right: Shimano TZ50-7
Fork
  • Front Fork: Rigid Hi-ten steel

Components

  • Front Brake: Disc brake resin pad, 160 mm
  • Rear Brake: Disc brake
  • Headlight: IP45 StVZO front light
  • Rear Light: E-Bike, 6-12V
  • Brake light: No
  • Grips: Rubber Grips
  • Handlebar: Dia. 31.8 mm, Rise: 25 mm, L: 640 mm
  • Pedal: Wellgo Anti Slip with Reflector
  • Saddle: Foam w/Leather Black
  • Seatpost: Non-Suspension Dia. 31.6 mm, L: 300 mm
Wheelset
  • Rim: Aluminum 36H, black
  • Tyre: KENDA

Key OEM Features

Custom Geometry Adapt frame geometry to your brand and riding position.
Motor Integration Support different motor configurations.
Battery Integration Multiple battery positioning options.
Internal Cable Routing Clean appearance and integrated routing.
Custom Finish Painting, decals and branding available.


Continue browsing

More Frame Models from the catalog

New drops and care notes

Get the next edit before it sells through.

Monthly product releases, care reminders, and practical buying guides. No loud campaigns.

Product news only. Unsubscribe anytime.

Have a design

OEM SUPPORT

BUYER DECISION CARD

Plan Your OEM Project with Confidence

Key commercial details to review before requesting a quotation.

01 / MOQ & Lead Time1

MOQ & Lead Time

MOQ starts from 50 pcs. Sample lead time is confirmed case by case after specification review. Production lead time is typically 45–55 working days.

MOQ 50 pcs / Samples case by case / 45–55 working days
Request an OEM Quote
02 / Trade Terms2

Trade Terms

Available trade terms: EXW · FCA · FOB · CFR · CIF.

EXW · FCA · FOB · CFR · CIF
Request an OEM Quote
03 / Quotation Process3

Testing & Quotation

Testing plans are defined by product type, target market and agreed specifications. Reports are available when included in the project scope.

Specification review / Agreed test plan
Request an OEM Quote